Description
The 5001 Superior Coin Bag™ is a heavy-duty clear bag sized at 10×13″ and built to hold up to a 10 lb coin load. Its reinforced construction stands up to the weight and handling of bulk coin transport without tearing.
Banks, credit unions, and cash-handling operations use it for secure coin deposits and Federal Reserve shipments. The clear film supports fast visual verification. Sold by the case.





